This page is the English translation of the chapter „Metodologia construirii strategiei” of Volume I of the strategy. The Romanian text is the reference version. Read the chapter in Romanian. Every substantive statement in the strategy carries a marker: [C] data confirmed in databases or official documents; [E] assessments and calculations by the project team, based on data; [I] interpretations and proposals of the project team; [D] statements made in the consultation, reported as such.
This section describes how the strategy was built: who decided, what data were collected and how, how they were analysed and how they became a diagnosis, options and policies. It also declares the use of artificial intelligence (AI) tools in the project and the extent to which people controlled their results, as required by the professional code of market, opinion and social research. The extended version of the methodology, with the details of each component, is in Volume III.
The working principle: human decision, AI-supported execution
The strategy was built by a team of sociologists, an anthropologist and specialists in tourism strategy, tourism marketing and communication. The working rule was the same at every stage: the team sets the questions, the sources, the criteria and the conclusions, and the AI tools carry out defined tasks, whose result is verified and approved by a member of the team [C].
Agentic execution meant carrying out a complex task in several steps: the AI agent read the project files, ran analysis scripts, searched for and verified public sources and drafted working versions of the documents, within the limits of an instruction and a specification set by the team [C]. The OECD distinguishes AI agents from “agentic AI”, that is, from systems that coordinate several agents, break down tasks on their own and operate over long periods with minimal human supervision. This second model was not used in the project: every task had an objective formulated by a person, and no result entered a deliverable without verification and without the approval of the project manager [C]. Human control was permanent, not only final: before execution, through the instruction and the specification; during it, through the corrections made to the working versions; after it, through verification and approval [I].
| Activity | Decision | Role of the AI tools | Human control |
|---|---|---|---|
| Research design, guides and questionnaires | the project manager and the team's experts | working variants of the instruments; import files for the survey platform | specification approved before generation; testing of the instruments |
| Recruitment of participants | the project manager, with OMD Brașov | analysis of the registration forms | selection and invitations, entirely human |
| Moderation of workshops and interviews | the moderator and the co-moderator | none | entirely human, with a field observer |
| Transcription | the project team | automatic transcription and segmentation by theme | full reading; correction of names, terms and the attribution of each line |
| Thematic coding | the project team | the extended inventory of themes; extraction of codes; counts | coding rules fixed by the team; approval of the grids |
| Statistical analysis | the project manager and the research expert | calculation scripts; recoding of open-ended answers; statistical tests | approval of the recoding; recalculation of every figure from the database |
| Secondary and official data | the project team | extraction, cleaning and calculation of the series | choice of sources, perimeters and parameters of the assessments |
| Interpretation and strategic options | the project team | variants of wording and arguments | the decision, marked [I] in the text |
| Drafting and formatting | the project team | working versions and generation of the Word documents | full reading, correction and approval of every version |
Source: the working records of the project [C].
The frame of reference
The ICC/ESOMAR International Code on Market, Opinion and Social Research and Data Analytics, revised in 2025, does not prohibit the use of AI in research, but sets conditions for it: researchers retain responsibility for and general oversight of the research, whatever the technology used; the client is informed when AI is used in compiling data, in analysis, in reporting or in interpretation; research materials remain confidential; the indirect identification of individuals is prevented; on publication, the role of AI and the extent of human oversight are stated [C]. The Code also requires researchers to distinguish clearly between findings, their interpretation and recommendations; the strategy's convention of markers ([C], [E], [I], [D]) applies this requirement at the level of each substantive statement [I].
The OECD AI Principles, revised in 2024, require the capacity for human intervention and oversight, the transparency of systems and accountability for their functioning [C]. Regulation (EU) 2024/1689 on artificial intelligence requires, from 2 February 2025, a sufficient level of AI literacy among the staff who operate the systems (Article 4) and, from 2 August 2026, the disclosure of texts generated or modified with AI and published to inform the public on matters of public interest, except those that have undergone human review and for which a person assumes editorial responsibility (Article 50(4)) [C]. The text of the strategy underwent a full human review, and editorial responsibility is assumed by the consortium; the exception applies, but the team chose to declare the use of AI, in line with the professional code [I]. The use of AI in the project does not fall within the high-risk categories defined by the Regulation [I].
Execution with AI agents has become current practice in the large consulting firms: in the third quarter of 2026, 62% of the organisations surveyed by KPMG were building, developing or using AI agents, and the audit firms launched, in 2025, their own AI agent platforms for tax, risk and finance [C]. The same studies show that governance lags behind adoption: 49% of the organisations surveyed by EY that use agentic AI have not updated their governance framework, and 78% of the leaders surveyed by Grant Thornton are not fully confident that they would pass an independent audit of AI governance [C]. The value of using AI therefore depends on the control of execution; this is also the criterion by which the method of the strategy should be judged [I].
Human coordination of the project
The strategy was produced by an association of three firms, led by BrandBerry srl, together with Horwath HTL România and GMP CommUnity, for OMD Brașov, under contract no. 58/15.05.2026, in five stages: stakeholder consultation, social research, the Integrated Multi-Criteria Diagnostic Analysis (ADMI), the drafting of the strategy and dissemination [C].
| Team member | Role in the project |
|---|---|
| Dr Romulus OPRICA (BrandBerry srl) | project manager; sociologist |
| Dr Lorena OPRICA (BrandBerry srl) | market research expert; sociologist |
| Călin ILE (BrandBerry srl, Horwath HTL România) | tourism marketing expert |
| Siniša TOPALOVIĆ (Horwath HTL) | external consultant; tourism strategy expert |
| Florian FILAT (GMP CommUnity) | communication and branding expert |
| Alex ICODIN | design expert; creative; teacher of design and visual art in advertising |
| Dr Florin DUMITRESCU | secondary expert; anthropologist; co-moderator of the consultations |
| Alexandra NĂSTASE, PhD candidate | sociologist; field observer in the consultations |
Source: the contract and the records of the project [C].
The project manager coordinated all the stages, moderated the consultations and the interviews and took the decisions on content, together with the team's experts and in dialogue with the management of OMD Brașov [C]. The workflow was sequential and mediated by documents: the team drafted or approved the specification, and the technical product was generated only after approval; the texts were iterated in numbered versions, and the Word documents were generated after the content had been validated [C]. The corrections made to the first chapters were brought together in a single document of drafting rules, applied to every new text of the strategy [C]. OMD Brașov was the beneficiary and the consultation partner of the project: it supported the organisation of the consultations, representatives of its management took part in some of them, and the deliverables of each stage were handed over and accepted along the way [C].
The group consultation
Recruitment started from a map of the categories of actors in the destination, by sector and by community, and participation was by registration, through an online form that recorded 239 visits and 122 completed forms, from 11 categories of stakeholders [C]. Twelve sessions were scheduled between 22 June and 16 July 2026; the session dedicated to medical and wellness tourism had no participants, and to the 11 thematic workshops was added, on 28 September 2026, a round table with architects and urban planners from the Brașov branch of the Romanian Order of Architects [C]. In Volume I, “workshops” means all 12 group consultations, attended by almost one hundred people [C].
The workshops were moderated by the project manager, in some sessions with an anthropologist as co-moderator and with a field observer, under the Chatham House Rule: the information may be used, but without identifying the speaker [C]. The facilitation guide included context data on the destination, the synthesis of the registration forms and structured exercises on the values of the destination, on what should be kept and what should change, on the 2034 vision and on the story of the destination [C]. Nine of the 11 thematic workshops were audio recorded, in 24 files, with a total duration of almost 19 hours; for the other two, the source is the written synthesis of ideas, supplemented, at the business community workshop, by a questionnaire with 18 questions [C]. The workshops were analysed exclusively by theme, without attribution to speakers; the unit of counting is the workshop, and the names of the participants do not appear in any document of the strategy [C].
| Workshop | Theme | Date |
|---|---|---|
| 01 | Poiana Brașov | 22 June 2026 |
| 02 | Culture and heritage: the institutions | 23 June 2026 |
| 03 | Culture, events and education for tourism: the cultural entrepreneurs | 23 June 2026 |
| 04 | Accommodation: hotels and guesthouses | 24 June 2026 |
| 05 | Food service and retail | 24 June 2026 |
| 06 | Medical, wellness and beauty tourism | 25 June 2026 (no participants) |
| 07 | Active tourism | 25 June 2026 |
| 08 | Tourist apartments (short-term rentals) | 26 June 2026 |
| 09 | The local community: the historic centre and Șchei | 10 July 2026 |
| 10 | The business community (Chamber of Commerce and Industry) | 9 July 2026 |
| 11 | The local community: the other neighbourhoods | 13 July 2026 |
| 12 | Academia | 16 July 2026 |
| 13 | Architects and urban planners (round table with the Brașov branch of the Romanian Order of Architects) | 28 September 2026 |
Source: the records of the project [C]. Quotations from the workshops are attributed throughout the volume by the number of the workshop, “(workshop NN)”, without identifying the speaker.
The individual interviews
The series comprised 22 interviews with 24 interviewees, chosen purposively by the project manager as key informants, so as to cover local public administration and public services, hospitality in the city and in Poiana Brașov, culture and heritage, nature, forests and mountain safety, gastronomy, retail, real estate development, ecotourism, marketing and communication, and the legal and political spheres [C]. To prevent indirect identification, the volume does not publish the link between these fields and the numbers of the interviewees [C]. The interviews were semi-structured, conducted face to face and audio recorded, with the consent of the interviewees; one interview conducted in English was translated in full, and quotations are taken from the translation [C].
Every interview followed the same flow: full reading of the transcript and its mapping; extended identification of themes; extraction of ideas and quotations, with the attribution of each line verified; full regeneration of the interview analysis report; updating of the theme screening grid [C]. The themes were coded by valence, with the proposals in a separate block; the initial grid retained 97 themes, consolidated to 100 after comparison with the workshops (90 themes also confirmed in the workshops, 10 only in the interviews), before the matrix of 148 themes [C]. In the documents of the strategy, interviewees appear only as “Interviewee N” („Subiect N” in Romanian), without a role descriptor; the detailed profiles and the sensitive passages remained in the internal analysis [C].
The national survey
The national survey is a cross-sectional quantitative survey, with a structured questionnaire administered online, on a research panel with national coverage, carried out by BrandBerry srl; Brașov was evaluated together with 14 other destinations in Romania, and the data were weighted by sex and by cultural area of residence, against the 2021 Population and Housing Census [C]. The details of sampling and weighting are in the report of the national survey, in Volume III.
The analysis was carried out exclusively on the weighted databases, with calculation scripts executed in the agentic workflow; associations between variables were tested with the chi-square test, at a significance level of 0.05 [C]. The answers to the open-ended questions were recoded in full from the raw text, with code dictionaries approved by the project manager, and before the volume was assembled every figure was recalculated from the databases [C]. The interpretation used the tourist area life cycle model [C].
Secondary data and official statistics
| Source | What it provides | Use in the strategy |
|---|---|---|
| National Institute of Statistics, TEMPO Online | arrivals, overnight stays, accommodation capacity, net occupancy rate, 2001–2025 | the figures of the destination; the baselines of the indicators; the scenarios |
| The destination analysis report | comparison with 43 cities in Romania, on official statistics and on data from online platforms | the position of Brașov in Romania; seasonality; tourism intensity |
| Data from short-term rental platforms | listings, occupancy, rates and revenue, in the city and in Poiana Brașov, 2023–August 2026 | the regime of tourist apartments; the assessment of the real volume |
| The list of classified accommodation units | classification certificates, including for apartments and rooms to let | the difference between the active supply and the classified supply |
| The consolidated database of online reviews | 47,513 reviews, of which 5,766 for Poiana Brașov | the visitor experience; gastronomy; points of friction |
| Data from Brașov-Ghimbav airport | passenger numbers, 2024–2025 | accessibility; foreign markets |
| Public policy documents | European regulations, national strategies, local decisions and documents | the frame of reference (section 1.3) and the legal framework (Annex 5) |
| The doctoral research on the symbolic geography of Brașov | the survey among residents and the in-depth interviews, around 2018 | the basis for the 2018–2026 comparison (section 1.6) |
| The tourism concept of the municipality (2023) | the problems and solutions identified earlier | secondary source, taken up only where it converges with the data and with the consultation |
| The benchmarks | the Slovenian tourism strategy 2022–2028; the comparison destinations; the European Tourism Indicator System (ETIS) | the cascade architecture; the reference level of the ADMI scores; the indicators |
Source: the inventory of the project's sources [C].
No source was used on its own: official data were compared with platform data, with the list of classified units and with the values of the comparison destinations [C]. Where official statistics do not cover the phenomenon (day visitors, unregistered accommodation, the resort separately from the city), the team built assessments, based on data, in scenarios with minimum, maximum and working values and with explicitly justified parameters; the assessments are marked [E] and are not presented as official data. External facts invoked in the consultation or in documents were verified in official or authoritative sources, with three degrees of confidence: officially confirmed, concordant secondary source, and unconfirmed [C]. What could not be confirmed remained a statement of the participant [D] or was flagged as such in the text.
Integrating the data into the strategy
Integration was done in four steps [C]. The consolidated consultation matrix crossed the themes of the interviews with those of the workshops and retained 148 themes: 39 strengths, 60 problems and 49 proposals. ADMI evaluated the destination on 7 domains and 30 criteria, with working weights set by the team and scores from 1 to 5, on two perimeters (the municipality, including Poiana Brașov, and the metropolitan area); the ranking of the variants for the exhibition centre and for the regime of tourist apartments was subjected to robustness tests. The dysfunctions found by ADMI and the themes of the consultation were brought together in 12 key challenges, each with three marked pieces of evidence. The strategy was built as a cascade, on the model of the Slovenian tourism strategy: key challenges, strategic objectives, development objectives, policies and measures; of the three scenarios analysed, the team chose growth in value.
Every measure can be traced upwards, to the strategic objective and to the challenge it responds to, and every theme of the consultation can be traced to the place where it was taken up (Annex 4) [C]. The targets of the indicators are proposals of the project team and are revised at the mid-term evaluation in 2030 [I]. The observations received in the public consultation on Volume I (October 2026) were analysed under the same rules of coding and marking as the Stage I material and integrated into the final version [C].
The agentic workflow and permanent human control
The project manager chose agentic execution for three reasons: the volume of the material (almost 19 hours of recordings from the workshops, 22 individual interviews, 47,513 reviews, the database of the national survey, the statistical series since 2001 and the monthly data of the rental platforms), the contractual term of 152 days for all five stages, and the requirement of traceability: every theme counted in all the sources, every quotation found in the transcript, every figure recalculated from the database [C/I]. Manual execution would have required either sampling the material or giving up some of the checks [I].
| Tool | What it was used for | What it did not do | Human control |
|---|---|---|---|
| Google AI Studio (Gemini models) | analysis of the audio recordings: automatic transcription, segmentation by theme and notes on each segment | the final attribution of each line; interpretation | full reading of the transcript; correction of names and terms; verification of attribution |
| NotebookLM (Google) | extraction of codes from the transcripts and querying them, with a reference to the source passage | the final grid of codes | comparison of the codes with the transcripts; approval of the grid |
| Claude (Anthropic), in agentic mode | full reading of the materials; the grids and matrices of themes; extraction and verification of quotations; recoding and statistical analysis; processing of secondary data and the model for assessing demand; verification of facts in public sources; working versions of the documents and generation of the Word and PowerPoint files and of the questionnaires | research and strategy decisions; approval of the deliverables | the approved specification; the drafting rules; the checks in the controlled workflow; approval of every version |
Source: the working records of the project [C].
Every task carried out by an AI agent went through the same six steps: framing (the objective, the sources, the criteria and the rules of the task, in a written instruction from the project manager); specification (the structure, the codes, the parameters, approved before execution); execution (the working version, only on the project's materials and on verifiable public sources); verification (quotations found verbatim, figures recalculated, facts confirmed in official sources, markers applied); decision and correction (recurring corrections become working rules); delivery (full reading and approval of the final version) [C].
Human control rested on eight rules, applied at every stage: the separation of decision from execution; the verification of quotations, found verbatim in the transcript, with omissions marked and the attribution of each line verified; the recalculation of figures from the databases; the verification of external facts in official sources, with the degree of confidence recorded; the source marker on every substantive statement; traceability, through numbered versions and counts calculated by formulas; anonymisation and confidentiality; the drafting rules, with a checklist before delivery [C].
Human control identified and corrected errors produced by the tools: wrong attributions of lines and distorted names in the automatic transcripts; quotations rendered in the original language of an interview; confusion between the positive and the negative valence of the same theme in a first matrix, then rebuilt in three blocks; unconfirmed factual statements, removed or downgraded to the status of a participant's statement; rounding differences in the statistical calculations [C]. Every correction was applied, and the recurring ones became working rules [C]. The agentic workflow was coordinated by the project manager, who works with AI-assisted qualitative analysis and who gave, in 2025, at BOKU Vienna, an invited workshop on AI and qualitative analysis for the Forest Policy Research Network of the European Forest Institute [C].
The limits of the method
We have identified six limits of the method [I]:
- participation in the consultation was based on registration: the voices of the workshops are those of interested and mobilised actors, not of a representative sample; the visitors' perspective comes from the national survey and from the online reviews;
- the interviews are a purposive selection of key informants: the frequency of a theme shows how many sources name it, not its weight in the population;
- the documentation is not uniform: two workshops were not recorded, the automatic transcripts have unclear passages, and a few interviews are partial at the beginning or at the end [C];
- the national survey covers the population with internet access; weighting corrects the structure by sex and by cultural area, but not the effect of self-selection in online panels, and the data are self-reported [C];
- official statistics see only part of tourism: they do not separate Poiana Brașov from the city, do not include day visitors and include short-term rentals only in part; the real volume of visits is an assessment by the project team, based on data [E];
- AI tools can produce errors: errors of transcription, attribution or wording are reduced by the human control described above, but cannot be excluded completely; the public consultation on Volume I was an additional check.
The limits are partly offset by triangulation: no important finding of the strategy rests on a single source [I]. The baselines that are missing today will be measured from 2027, through the instruments of the destination observatory (section 4.5) [I].
Sources cited in this chapter
- ICC/ESOMAR (2025), ICC/ESOMAR International Code on Market, Opinion and Social Research and Data Analytics, fundamental principle 5, Art. 6(c), Art. 7(d)–(f) and Art. 9(b): https://community.esomar.org/uploads/public/knowledge-and-standards/codes-and-guidelines/ICCESOMAR-International-Code_English.pdf
- OECD (2026), The agentic AI landscape and its conceptual foundations, OECD Publishing, Paris: https://www.oecd.org/en/publications/the-agentic-ai-landscape-and-its-conceptual-foundations_396cf758-en.html
- OECD, Recommendation of the Council on Artificial Intelligence, OECD/LEGAL/0449, revised in May 2024: https://legalinstruments.oecd.org/en/instruments/OECD-LEGAL-0449
- Regulation (EU) 2024/1689 of the European Parliament and of the Council on artificial intelligence, Art. 4 and Art. 50(4): https://eur-lex.europa.eu/eli/reg/2024/1689/oj
- KPMG US, AI Quarterly Pulse Survey, third quarter of 2026, press release of 24 September 2026: https://kpmg.com/us/en/media/news/q3-ai-pulse-2026.html
- EY US, AI Risk and Governance Survey, press release of 15 September 2026: https://www.ey.com/en_us/newsroom/2026/09/ey-survey-finds-that-autonomous-ai-implementation-outpaces-oversight-yielding-an-ai-governance-gap
- Grant Thornton, AI Impact Survey 2026, press release of 13 April 2026: https://www.grantthornton.com/insights/press-releases/2026/april/grant-thornton-survey-on-ai-proof-gap
- Chatham House, Chatham House Rule: https://www.chathamhouse.org/about-us/chatham-house-rule
- Collins, J. C., Porras, J. I. (1996), “Building Your Company's Vision”, Harvard Business Review, 74(5): https://hbr.org/1996/09/building-your-companys-vision
- Butler, R. W. (1980), “The concept of a tourist area cycle of evolution: implications for management of resources”, Canadian Geographer, 24(1), 5–12: https://doi.org/10.1111/j.1541-0064.1980.tb00970.x
- Aldea, L. (Oprica) (2020), „(re)Construcția identitară a Brașovului. Geografia simbolică a orașului”, doctoral thesis, SNSPA; the author's article on the online image of the city: https://doi.org/10.31926/but.ssl.2020.13.62.2.10
- Slovenian Tourism Strategy 2022–2028: 12 key challenges, 5 strategic objectives, 20 development objectives, 7 key policies and 3 horizontal policies, 94 measures: https://www.advantageaustria.org/si/news/Ksenija_Flegar_Investments_in_Slovenian_Tourism.pdf
- European Commission, The European Tourism Indicator System, ETIS toolkit for sustainable destination management (2016): https://ec.europa.eu/docsroom/documents/21749/attachments/1/translations/en/renditions/native
The chapter in Romanian (Volume I)The extended methodology (Volume III)The evidence base (Volume III)